Solar panels on Virginia solar farm

Energy

Altavista Solar Farm

80 MW solar facility in Altavista, Virginia

Project Details

Market

Energy

Location

Altavista, Virginia (Campbell County)

Project Partners

DEPCOM Power (EPC), J.E. Shurden Construction (civil contractor), Apex Clean Energy (developer)

Construction Timeline

Completed in 2022

Project Size

80 MW | 720 acres

Our Scope

Erosion control supplier

Materials Supplied

Key products we supplied to Altavista Solar during construction.

95,000

square yards of geotextiles

50,000

pounds of grass seed

5,200

rolls of erosion control matting

8,200

linear feet of HDPE pipe

About the Project

Altavista Solar near Lynch Station, Virginia was Campbell County’s first utility-scale solar project. The 80-megawatt solar farm covers nearly 720 acres of land in Altavista, Virginia.
DEPCOM oversaw the engineering and construction of Altavista Solar Farm which was developed by Charlottesville-based Apex Clean Energy. In November 2019, Facebook purchased 61.6MW of the solar site. The solar farm became fully operational in March 2021 although final closeout construction is ongoing in 2022.

Renewable Energy Experience

Related Projects

Reinforced silt fence on Puller Solar Farm

15 MW iN Middlesex, VA

Puller Solar Farm

GEOWEB installed on Brandywine Solar

Community solar in MD

Brandywine Solar

Spotsylvania Solar Farm in Spotsylvania, VA

617 MW in spotsylvania, va

Spotslylvania Solar

Let’s Get to Work